Clamart

Châtenay-Malabry, on the route of the T10 tramway line, Clamart is a construction project for a maintenance and storage site for this line (SMR). Designed by the architectural agency AIA Life Designers, Clamart offers us opaque terracotta facades allowing perfect integration into its wooded environment.

In charge of the technical design of the architectural facings, our work focused on the study and layout of the terracotta cladding. This intervention, in the execution phase, resulted in the production of :

  • Mechanical calculation notes,
  • Thermal calculation notes,
  • Technical files,
  • Principle Plans,
  • Reservation plans,
  • Execution plans,
  • Manufacturing launches,
  • Record of works executed.

Locality

Chatenay Malabry (92)

Area

NC

Cost

30 000 000 € HT

Calendar

2020

Project management

STIF (Syndicat des Transports d'Île-de-France)

subject mastery

AIA Architectes

Photo credit

AIA Architectes